Strategic advisory

Real estate Resorts

Our Views / Development decisions

Connecting strategy to delivery in a mixed-use urban project

A mixed-use urban project needs a shared basis for decisions across market research, product development, design and operation. Managing the handover points limits the gap between the investment direction and the work actually done.

An illustration: disconnected development stages versus one connected project life cycle

Every component needs to serve one shared development goal

An urban area can combine housing, retail, services and amenities. Each component has its own revenue model, schedule and operating needs, yet all of them draw on the project's infrastructure, space and investment resources.

If each part is decided separately, a change in one component can create cost or limit operations in another. So the development strategy needs to make clear who the customers are, the role of each component and the assumptions driving the investment option.

Manage the handover points between disciplines

Market research has to turn into product requirements; the business model has to show up in the functions; the design has to be checked against resources and operating capability. At each handover point the parties need to agree the inputs, the expected results and the acceptance criteria.

A single coordinator can track consistency across options, record changes and escalate decisions that go beyond any one discipline. This role needs to be defined with specific authority and responsibility within the project organisation.

Check changes against investment performance

An adjustment to scale, product mix or phasing should be considered together with its effect on cost, cash flow and the ability to operate. The decision record should state which assumption changed, which option was chosen and which work must be updated as a result.

Bring operating requirements into the development stage

The operating capability of retail, services and amenities needs to be taken into account before the design is finalised. This approach gives the investor a basis to assess the project by both the construction schedule and the operating conditions after handover.

Learn about advisory on new project development

Learn about new project development advisory